Portfolio Category: Recreational, Ski Area

Killington Ski Area

Pump Station

Client: Killington Ski Area
Location: Mirror Lake

Killington’s wastewater spray pump station was replaced in 2019 to ensure reliable operation of the two spray fields used for wastewater disposal.

Read More...

Pinnacle Condominium

Water System Upgrade

Client: Pinnacle Condominiums
Location: Killington, VT

Pinnacles water system was original to the development and the Board of Directors was becoming concerned was that an equipment failure could leave the development without water.  The public community water system serves 150 living units.

Read More...

Killington Ski Area

Providing Water Supply and Wastewater Engineering Services

Client: Killington Ski Area
Location: Killington, VT

Since 1982 Enman Kesselring has had the pleasure of working for Killington Ski Area on their water and wastewater infrastructure systems.  The scale of a small city, Killington’s infrastructure spans six mountain areas, and encompasses base lodges, office space, hotels, and condominiums developments.

Read More...

Mount Equinox Visitors Center

St. Bruno's Mount Equinox Viewing Center

Client: Carthusian Monks
Location: Summit of Mount Equinox, Manchester, VT
Project: A public service project by the Carthusian Monks

St. Bruno’s Scenic Viewing Center, located atop Mount Equinox, faced many obstacles as the Carthusian Monks proposed to demolish the former Mount Equinox Hotel and replace it with the viewing center. The Mount Equinox Hotel had been developed circa 1940 by Dr. Davidson and was on the State Historical Register. Located at an elevation of 3,848 feet, at the end of a 5.2 mile drive up Mount Equinox, the center has breathtaking and panoramic views of the Green, White, Adirondack, Berkshire and Taconic Mountain ranges.

Read More...

Ski Area Residential Development

Water Supply Relocation Project

Client: Insert Client Name
Location: Topridge Development, Killington

Enman Kesselring provided engineering for a homeowner at Topridge to construct their home on the two highest lots in the development. Prior to beginning construction an 8″ water main serving the development needed to be relocated because it was in conflict with the house location.

Our office worked closely with the Sunrise and Topridge Developments to evaluate options and design and permit the relocated water main.

Read More...