Top Menu

Menu
Menu

Ski Area Residential Development

Water Supply Relocation Project

Location: Topridge Development, Killington, VT
Contractor: Mosher Excavating
Designer/Builder: Beibel Builders

Type of Project

  • Recreational, Ski Area
  • Residential
  • Project Scope

  • Wastewater
  • Water Supply
  • Project Details:

    Enman Kesselring provided engineering for a homeowner at Topridge to construct their home on the two highest lots in the development. Prior to beginning construction an 8″ water main serving the development needed to be relocated because it was in conflict with the house location.

    Our office worked closely with the Sunrise and Topridge Developments to evaluate options and design and permit the relocated water main. Design and permitting for the homes sewer and water connection to the community systems was also provided.

    Given the homes location, on the side of a mountain, extensive retaining wall systems were required to step the natural elevation and allow the house to fit on the land the way the landowner envisioned.  This also achieved the homeowners goal of the house being ski on and ski off.

    Related Projects