Portfolio Category: Stream Alterations Permit

Stage Road Culvert Replacement

Tropical Storm Irene Recovery

Client: Town of Killington
Location: Stage Road, Killington VT
Project: Stage Road Bridge

Tropical Storm Irene, August 28, 2011, destroyed the existing 12.5’ by 8’ plate arch culvert in the South Branch of the Tweed River, collapsing the culvert and washing out the road.

Read More...

Ottauquechee River Bridge

Bridge Design

Client: Town of Killington
Location: Killington, VT

The Ottauquachee River flowed beneath Thundering Brook Road through three 84” corrugated metal pipe arch culverts. While the velocity in the river was generally moderate to slow, ice and debris damage had deteriorated the inlets, and age had rotted the inverts, leaving the structural integrity in question.

After TS Irene, the town of Killington engaged in a culvert assessment and determined that the three arch pipes needed to be replaced.

Read More...

Kent Brook Bridge, Killington

Municipal Bridge Project

Client: Town of Killington
Location: Killington, VT

The project entailed the replacement of a single lane 13 ft. span wooden bridge with a cast-in-place reinforced concrete bridge deck with a 20 ft. span and gravel surface. The project provided the town with a bridge that their municipal trucks could safely travel across.

Read More...